Project: Goldsmith Street, Norwich
Client: R G Carter Limited
Value: £750,000.00
Programme: 72 weeks
Description: The scheme consisted of the construction of 104 dwellings built to Passive Haus standards in the centre of Norwich.
Our Works: Comprised the installation of all plumbing, mechanical ventilation, and heat recovery (MVHR) systems, gas boilers, control systems and mains services.
Standard achieved were exceptional and the project achieved numerous accolades including the following awards:
- Stirling Prize 2019
- Neave Brown Housing Awards 2019
- RIBA East Awards 2019
- RIBA East Sustainability Award 2019
- RIBA Client of the Year Award 2019
- Campaign to Protect Rural England Green Award 2018
Recent Projects

Planned Maintenance for South Cambridgeshire District Council
Kitchen and bathroom replacement and upgrade framework contract for South Cambridgeshire District Council. Our works included planned and Ad hoc replacements of existing kitchens and bathrooms occupied houses and voids.

Beeston, Sheringham
Land was purchased with full planning permission with several reserved matters which were discharged, and 2 pairs of traditional semi-detached cottages were constructed.