Skip to main content

Project: Foster Business Park (Phase 1-3) Wisbech.

Value: £1,500,00 (Phase 1).

Programme: 40 weeks.

Description: Phase 1 Design and build of 8 (35,000 square feet) self-contained portal framed industrial units including offices and warehouse spaces built to a high standard with external concrete hardstanding’s and car parking.

Phases 2 (to be constructed) Design and build of 14 (36,00 square feet) self-contained portal framed industrial units including offices and warehouse spaces built to a high standard with external concrete hardstanding’s and car parking.

Phases 3 (to be constructed) Design and build of 15 (32,000 square feet) self-contained portal framed industrial units including offices and warehouse spaces built to a high standard with external concrete hardstanding’s and car parking.

See our properties for rent and sale

Recent Projects

Property Development

Church Farm and Barn, Parson Drove

Church Farm included a full strip out, damp proofing, replacement of rotten timbers, repointing, new services, and a full refurbishment to bring the building up to current standards without losing the charm of the original building.
Property Development

Scrimshires Passage

The Grade II listed 2-bedroom property which was in the middle of Wisbech in a restricted location being at the end of a one way street and opposite the busy Horsefair bus and shopping. The works consisted of internal demolitions, asbestos removal, removal of floors, wall modifications, new drainage, replacement…
Building Services

Goldsmith Street, Norwich, Norfolk

The scheme for Norwich City Council is for the construction of 104 Passive House homes in the centre of Norwich on the old care home site Goldsmith Street, off Dereham Road.
Ashlar

Barn Refurbishments, Little Witchingham

Ashlar Purchased the site with planning and reserved matters. The site incorporated a large derelict barn complex. Existing barns converted into 4 x executive homes with 1 x new build property to match existing style.