Project: Care and Repair, Peterborough.
Client: Peterborough City Council.
Value: £175,000 per annum
Programme: 3 years +1 year.
Description: Disabled care adaptions in occupied premises across Peterborough City.
Our Works: Include internal alterations, level access showers, disabled toilets, small extensions, boiler upgrades, external ramps, paths, and hardstanding’s.
Recent Projects

Church Farm and Barn, Parson Drove
Church Farm included a full strip out, damp proofing, replacement of rotten timbers, repointing, new services, and a full refurbishment to bring the building up to current standards without losing the charm of the original building.

Care and Repair, King’s Lynn and West Norfolk.
Our work included internal alterations, level access showers, disabled toilets, small extensions, external ramps, paths and hardstanding's.

Heating Replacement Programme
Heating replacement and upgrade Framework contract for South Cambridgeshire District Council.

Wisbech Police Station Refurbishment
Included demolitions, asbestos removal, remodelling and a full refurbishment programme including all necessary mechanical, electrical, extract, alarm, air conditioning, plumbing and sanitary ware. External works consisted of new wash bay, alterations to drainage and resurfacing.